| Legend: |
| - CM = Regulation (EC) No 1228/2003 on conditions for access to the network for cross-border exchanges in electricity No. 770/09.11.2006; |
| - GGP = Guidelines of Good Practice on Information Management and Transparency in Electricity Markets Ref: E05-EMK-06-10 2 August 2006 |
| - CC = Electricity Wholesale Market Commercial Code - No. 25/22.10.2004 |
| - ANRE MM = The Methodology of Wholesale Electricity Market Monitoring for Assessing the Competition Level on Market and Preventing the Abuse of Dominant Position. (revision no.1) – A.N.R.E Code.: 35.2.407.0.01.07/12/2006 |
| No | Information | Details | File (MB) |
Observations |
|---|---|---|---|---|
1 |
Relevant information for Capacity Allocation Market participants CM Annex 5.3 |
- registration - auction guide - withdrawal, revocation, suspension - obligations and rights of both the TSOs and the party obtaining the capacity, including the liabilities that accrue upon failure to honor obligations |
![]() |
- Framework contract - Operational Procedure - Auction’s Information |
2 |
Details on TTC, TRM, NTC, AAC and ATC for each capacity allocation session.
CM Annex 5.5 e) GGP 2.7, 2.9 CC 15.3.1.3 a), 15.3.5.3 a) |
- per each auction period, direction (import or export), border, in hourly resolution (for daily/intra-day auction) | ![]() |
NTC annual and monthly values |
![]() |
Annual and monthly auctions organized by Transelectrica | |||
|
Annual and Monthly auctions Bulgaria and Hungary |
|||
Daily and Intraday auctions organized by Transelectrica Daily auctions Hungary 2010 - 2011 Link MAVIR
|
||||
3 |
Remaining capacity after any market closing CM Annex 5.5 e) CC 15.31.3 a), 15.3.5.3 a) |
- per each auction period, each direction (import or export), border, in hourly resolution (for daily/intra-day auction) | ![]() |
Annual and monthly auctions organized by Transelectrica |
|
Annual and Monthly auctions Bulgaria and Hungary |
|||
Daily and Intraday auctions organized by Transelectrica Daily auctions Hungary 2010 - 2011 Link MAVIR
|
||||
4 |
Total volume of offers submitted by market participants, capacity allocated to market participants, the auction price and winners names CM Annex 5.5 f) GGP 2.9 CC 15.3.5.3 b), 15.3.5.3 c) |
- per each auction period, each direction (import or export),border, in hourly resolution (for daily/intra-day auction) | ![]() |
Annual and monthly auctions organized by Transelectrica |
|
Annual and Monthly auctions Bulgaria and Hungary |
|||
Daily and Intraday auctions organized by Transelectrica Daily auctions Hungary 2010 - 2011 Link MAVIR
|
||||
5 |
ATC for next day in case of implicit auctions per border between bidding areas / control areas, | - hourly values | There are no implicit auctions | |
6 |
Remaining ATC for next day, after the implicit auctions, per border between bidding areas / control areas | - hourly values | There are no implicit auctions | |
7 |
Total capacity nominated CM Annex 5.5 g) CC 15.3.1.2 c), 15.3.2.2 c), d), 15.3.2.3 |
- aggregated values of capacity nominated by market players on each border, per market time unit, (export, import, balance) | |
- Daily Reports - Balancing market |
| -exchange balance of the National Power System, daily average value | ![]() |
NPS’s Operational Report Previous years can be viewed in Chapter System Load ,section1 |
||
8 |
Physical flows on the interconnections GGP 2.15 |
-import/export and balance -per market time unit |
![]() |
Etsovista.org |
| - in real time | ![]() |
System status | ||
9 |
Congestion income after each auction GGP 2.13 | - per each auction period, each direction (import or export),border, in hourly resolution (for daily/intra-day auction) - Incomes will be pubilshed when they exist |
![]() |
Annual and monthly auctions organized by Transelectrica |
|
Annual and Monthly auctions Bulgaria and Hungary |
|||
Daily and Intraday auctions organized by Transelectrica Daily auctions Hungary 2010 - 2011 Link MAVIR
|
||||
10 |
Description of reasons of any TSO’s refusal to accept a capacity transaction on the secondary market (capacity transfer) CM Annex 2.12 |
![]() |
Reasons of any refusal taken by TSOs | |
11 |
Synthesis of data resulting from monitoring the Capacity Allocation Market - ANRE MM Art.68 | - general observation, - for each auction period, for each border and direction: auction price, TTC, NTC, ATC, requested capacity, allocated capacity, final allocated capacity, number of participants, specific indicators (C1, C3, HHI), usage of the allocated capacity |
![]() |
Monthly Monitoring Report for Capacity Allocation Market |