6. Required Transparency on Transport Network Operation
| No |
Information |
Details |
File (MB) |
Observations |
1 |
Details on actual outages (planned and unplanned) of the interconnections, immediately after occurrence
CM Annex 5.1 , GGP 2.8 |
Asset concerned, place, start and estimated stop date of the outage, reasons, impact on available transmission capacity |
(0.09) |
|
(0.04) |
Archive of actual outages |
2 |
All relevant data related to network access
CM Annex 5.1 |
Requirements for connection to the power transmission grid |
 |
Electricity Transmission Grid - Technical Code |
 |
Technical conditions for the wind power plants connections to the power transmission grid |
| Procedures applied by Transelectrica in relationship with users in the process of connection to the power transmission grid |
(0.8) |
Handbook for the users requesting connection of new generation or consumption places to the electricity transmission grid
|
(0.63) |
Handbook for the users requesting the sitting permit from CNTEE Transelectrica SA
|
(0.92) |
Applicants’ guide for the wind power plants (WPPs) connection to the power transmission grid
|
3 |
All relevant data related to network use
CM Annex 5.1 |
Monthly physical exchanges and monthly report of net production |
(0.04) |
(Monthly report-Net production) |
(0.04) |
(Monthly Physical Exchanges) |
(0.04) |
(Archive of monthly report-Net production) |
(0.04) |
(Archive of monthly physical exchanges) |
| Relevant data related to consumption , electricity exchanged with other countries , development of electricity market, performance indicators , transmission grid , structure of installed capacity |
 |
Annual operational report NPS |
 |
Technical results of operation NPS |
| Operational planning studies |
 |
Operational planning studies |
4 |
The performance indicators for electricity transmission and system services |
According to the Standard of performance for electricity transmission and system services
Indicators covering:
-Transmission Service / Management and operation of the power transmission grid
- System Services / Coordination of NPS operation
- Continuity of service
- Technical quality of electricity
- Commercial quality of service
- Monitoring the continuity and electricity quality
|
(0.29) |
|