Romana   Send Email   Print
new
2012-04-25
- Transelectrica, founding member of the Coordinated Auction Office Ltd. - CAO - in south-eastern Europe

new
2012-02-27
- PRESS NOTIFICATION

new
2012-02-15
- Mr. Octavian Lohan is the new Director General of Transelectrica

new
2012-02-15
- PRESS NOTIFICATION

new
2012-02-13
- Documents for discussion : Revision of Agreement and Auction Rules, border Romania Bulgaria for 2012

new
2012-02-13
- The Romanian Power System is operating in safe conditions and there is no risk to discontinue the normal electricity supply of the population

new
2012-02-10
- IMPORTANT ANNOUNCEMENT

new
2012-02-08
- Documents for discussion: OP - Technical certification that wind farms comply with the provisions of the Techical norm 51 'TEL07 V OS - DN/140'

new
2012-02-08
- The public debate has begun on the pan European Code to connect generators, until March 20th, 2012

new
2012-02-06
- Documents for public consultation: Revision of Agreement and Auction Rules, border Romania Hungary for 2012

new
2011-12-20
- Romania formally expressed the interest to join the project for coupling the Czech, Slovak and Hungarian electricity markets

new
2011-10-31
- Transelectrica is initiating a new project to increase the interconnection capacity between Romania and Serbia - the 400 kV double circuit OHL Resita–Panchevo

new
2011-09-16
- CIGRE and Transelectrica , under the high patronage of the Ministry of Economy, Commerce and Business Environment are organising the 2011 CMDM Conference

new
2011-09-06
- Transelectrica is celebrating five years since the first transacting day of the shares that the Company issued on the regulated market

new
2011-07-28
- The managerial team of Transelectrica received a visit of Company Moldelectrica from the Republic of Moldova

new
2011-05-23
- Transelectrica has received the visit of the friendship parliamentary group Sweden - Romania

new
2011-05-18
- Transelectrica has officially inaugurated the 400 kV substation Tariverde from Constanta County

new
2011-05-11
- Mr. HORIA HAHAIANU is the new Director General of Transelectrica

new
2011-02-10
-
Important notice regarding the users' connection to electric networks of public interest



All News ...
Balancing Market
Operator

Acquisitions
Operational Report
Contact
Links
Media
Publications Publications
Photo Gallery Photo gallery
Transparenta
7. Required Transparency of Generation
Legend:
- CM = Regulation (EC) No 1228/2003 on conditions for access to the network for cross-border exchanges in electricity No. 770/09.11.2006;
- GGP = Guidelines of Good Practice on Information Management and Transparency in Electricity Markets Ref: E05-EMK-06-10 2 August 2006
- CC =  Electricity Wholesale Market Commercial Code - No. 25/22.10.2004

No Information Details File
(MB)
Observations
1
Day-ahead generation forecast per control area    CM Annex Chap.5.7
CC 15.3.1.2 b)
- hourly values
- gross/net values
. (506.5)
2
Week-ahead generation forecast per control area
CM Annex Chap.5.7
- hourly values
- gross/net values
. (506.5)
3
Month-ahead generation forecast per control area
CM Annex Chap.5.7
- hourly values .(650.5)
4
Year-ahead generation forecast per control area    CM Annex Chap.5.7 - monthly average values .(48.5)
5
Ex-post information on planned and unplanned outages of generation units larger than 100 MW
CM Annex 5.5 i), 5.8
-power plant name
-unit name
-technology type
-location
-start and stop date of the outages
-installed capacity,                  -maximum available power on the balancing market
-unavailable capacity
-type of outage (planned/unplanned)
-observation  

.(107.5)
.(421.84)
6
Ex-ante information on planned outages of generation units larger than 100 MW
CM Annex 5.5 i)
GGP 3.2
-power plant name
-unit name
-technology type
-location
-start and stop date of the planned outages
-installed capacity,                  -maximum available power on the balancing market
-unavailable capacity
-type of outage (planned/unplanned)
-observation
.(20)
7
Day-ahead forecast of  electricity delivered by undispatchable units CM Annex 5.7 . - Daily Reports - Balancing market
8
Forecast and actual intermittent generation (e.g. wind) GGP 3.6 .(476.5) - Daily actual wind generation- necessary data are in column"Eoliana"
.(2075.66)
. - Daily Reports - Balancing market - Forecast and actual intermittent generation
9
Ex ante information on the planned unavailability of significant consumption units (units larger than or equal to 100MW) GGP 3.3 - unit name
- start and stop date of the unavailability
- installed capacity
- unavailable capacity
- observation
.(90)
.(0)
10
Ex post information on the planned/unplanned unavailability of significant consumption units (units larger than or equal to 100MW)
 
GGP 3.8
-unit name
- start and stop date of the unavailability
- installed capacity
- unavailable capacity
- observation
.(93.5)
.(34.46)
11
Filling rate of the water reservoirs in an aggregated form, in terms of percentage of the 100% filling
GGP 3.5
.(146.5)
.(17.5)
12
Total and available
installed generation
capacity for each dispatchable
unit, per primary sources of energy

GGP 3.1,
CC 15.3.1.2 b)
- power plant name
- unit name
- location
- technology type
- installed capacity
- available power
-observations
- gross/net values
.(113) Updated database on 01.01.2012
.(342.31)
- net values, aggregated per primary sources of energy .(55.5)
13
Total and available
installed generation capacity aggregated for all undispatchable units,
per primary sources of energy
GGP 3.1, CC 15.3.1.2 b)
- Gross/net values .(39.5) Updated database on 01.01.2012
.(294.98)
14
Foreseeable aggregated evolution of total and available installed generation capacity for the next 3 and up to 10 years (including information on the type of generation from new projects, planned mothballing or dismantling)
GGP 3.1, CC 15.3.1.2 b)
- Evolution for the next
min 3 following years
.(31)
15
Contracts for new power plants connection to the power transmission grid .
16
Appraisals for new power plants connection to the power transmission grid .
17
Ex post information on actual generation
GGP 3.9
CC 15.3.2.2 a)
- Hourly average values (total and per primary sources of energy) .(476.5) Daily actual generation -
.(2075.66)
- Aggregated per primary sources of energy (real time) . System status
-Daily average value (and separately per primary sources of energy) Download (0)

Operational reports 2010

Previous years can be viewed in Chapter System Load ,section1

- Monthly average values .(40)
18
Ex ante aggregated information on the scheduled generation per control area
GGP 3.4
CC 15.3.2.2 a)
- Per market time unit .
Daily Reports - Balancing market