Web Content Display

7. Required Transparency of Generation

 

Legend:
- CM = Regulation (EC) No 714/2009 of the European Parliament and of the Council of 13 July 2009 on conditions for access to the network for cross-border exchanges in electricity and repealing Regulation (EC) No 1228/2003;
- GGP = Guidelines of Good Practice on Information Management and Transparency in Electricity Markets Ref: E05-EMK-06-10 2 August 2006
- CC =  Electricity Wholesale Market Commercial Code - No. 25/22.10.2004

 

No Information Details File Observations
1 Ex-post information on planned and unplanned outages of generation units larger than 100 MW
CM Anexa 5.5 i), 5.8
- power plant name
- unit name
- technology type
- location
- start and stop date of the outages
- installed capacity
- maximum available power on the balancing market
- unavailable capacity
- type of outage (planned/unplanned)
- observation
In situatia nefunctionarii va rugam sa accesati datele pe platforma EMFIP. In case of technical issues please access the EMFIP platform.
2 Day-ahead generation forecast per control area
CM Annex Chap.5.7
CC 15.3.1.2 b)
- hourly values
- gross/net values
3 Week-ahead generation forecast per control area
CM Annex Chap.5.7
- hourly values
- gross/net values
4 Month-ahead generation forecast per control area
CM Annex Chap.5.7
- hourly values
5 Year-ahead generation forecast per control area
CM Annex Chap.5.7
- monthly average values
6 Ex-ante information on planned outages of generation units larger than 100 MW
CM Annex 5.5 i)
GGP 3.2
- power plant name
- unit name
- technology type
- location
- start and stop date of the planned outages
- installed capacity,
- maximum available power on the balancing market
- unavailable capacity
- type of outage (planned/unplanned)
- observation
7 Day-ahead forecast of electricity delivered by undispatchable units
CM Annex 5.7
- Daily Reports
- Balancing market
8 Forecast and actual intermittent generation (e.g. wind)
GGP 3.6
9 Ex ante information on the planned unavailability of significant consumption units (units larger than or equal to 100MW)
GGP 3.3
- unit name
- start and stop date of the unavailability
- installed capacity
- unavailable capacity
- observation
10 Ex post information on the planned/unplanned unavailability of significant consumption units (units larger than or equal to 100MW)
GGP 3.8
- unit name
- start and stop date of the unavailability
- installed capacity
- unavailable capacity
- observation
11 Filling rate of the water reservoirs in an aggregated form, in terms of percentage of the 100% filling
GGP 3.5
12 Total and available installed generation capacity for each dispatchable unit, per primary sources of energy
GGP 3.1,
CC 15.3.1.2 b)
- power plant name
- unit name
- location
- technology type
- installed capacity
- available power
-observations
- gross/net values
Updated for 01.02.2024
- net values, aggregated per primary sources of energy
13 Total and available installed generation capacity aggregated for all undispatchable units, per primary sources of energy
GGP 3.1,
CC 15.3.1.2 b)
- Gross/net values Updated for 01.02.2024
14 Foreseeable aggregated evolution of total and available installed generation capacity for the next 3 and up to 10 years (including information on the type of generation from new projects, planned mothballing or dismantling)
GGP 3.1, CC 15.3.1.2 b)
- Evolution for the next min 3 following years
15 Appraisals for new power plants connection to the power transmission grid
16 Contracts for new power plants connection to the power transmission grid
17 Ex post information on actual generation
GGP 3.9
CC 15.3.2.2 a)
- Hourly average values (total and per primary sources of energy) Daily actual generation
- Aggregated per primary sources of energy (real time) System status
- Daily average value (and separately per primary sources of energy)

Operational reports 2010

Previous years can be viewed in Chapter System Load ,section1

- Monthly average values
18 Ex ante aggregated information on the scheduled generation per control area
GGP 3.4
CC 15.3.2.2 a)
- Per market time unit Daily Reports - Balancing market
20 Total installed and available generation capacity, per primary sources of energy Gross valuess Updated for 01.02.2024