Skip to Content

Consumption: 0 MW    Production: 0 MW    Exchange balance: 0 MW

SEN Integration of the wind power plants

Navigation

  • About Us
    • History
    • Quality & Environment
    • Profile
    • Supervisory Board
    • Directorate
    • Framework Documents
    • Documents for discussion
    • Licenses and permits
    • Affiliations
    • Corporate Social Responsability
    • Human Resourses
    • GDPR
    • OUG 109/2011 Transparency
  • Investor Relations
    • Bond Issuances
    • Secondary Public Offering
    • Shares
    • Shareholders
    • Shareholders' General Assembly
    • Periodical Reports
    • Current Reports
    • Corporate Governance
    • Rating
    • Services
    • Contact RI
    • General Presentation IR
    • Attendance at Investor and Analyst Conferences
  • ETN Management
    • Background Data
    • Planul de Dezvoltare RET 2024-2033
    • Planul de Dezvoltare RET 2022-2031
    • Planul de Dezvoltare RET 2020-2029
    • SEN Integration of the wind power plants
    • Network Access Mode
    • Strategy
    • Projects
    • Environmental Investments Reports
    • Background Data
    • Modernization Fund
    • PNRR - REPOWER EU
    • Programul de Dezvoltare Durabilă 2021-2027
    • Aviz de amplasament
    • Research & Innovation
  • Transparency
    • Rates
    • Procedures
    • System Load
    • Network Investments and Planning
    • Capacity Calculation
    • Capacity Forecast
    • Capacity Auction and Use Data
    • Network Operation
    • Generation
    • Balancing and Ancillary Services
    • Rapoarte Achizitii
    • Raport anual privind aplicarea Legii nr. 544/2001
    • Newsletter
    • Norme tehnice interne
    • Compensarea dezechilibrelor in cadrul IGCC
  • Electricity Market
    • Balancing market
    • Metering Operator
    • Ancillary services market
    • Green certificates market
    • Capacity Allocation Market
    • Energy transmission service
    • High efficiency cogeneration
    • Debt Reports
    • Contracts for Difference
  • Paneuropean Codes
    • Regulation (EU) 2019/943 on the internal market in electricity
    • COMMISSION REGULATION (EU) 2016/631 of 14 April 2016 establishing a network code on requirements for grid connection of generators
    • COMMISSION REGULATION (EU) establishing a Network Code on Demand Connection
    • COMMISSION REGULATION (EU) establishing a network code on requirements for grid connection of high voltage direct current systems and direct current-connected power park modules
    • COMMISSION REGULATION (EU) establishing a guideline on electricity transmission system operation
    • COMMISSION REGULATION (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management
    • COMMISSION REGULATION (EU) establishing a guideline on forward capacity allocation
    • Commission Regulation establishing a guideline on electricity balancing (EB)
    • Commission Regulation establishing a network code on emergency and restoration (ER)
    • Consultations

Breadcrumbs

  • Transelectrica
  • ETN Management
  • SEN Integration of the wind power plants

About Us

  • Background Data
  • Planul de Dezvoltare RET 2024-2033
  • Planul de Dezvoltare RET 2022-2031
  • Planul de Dezvoltare RET 2020-2029
  • SEN Integration of the wind power plants
    • Background study
    • Appraisals / Contracts
  • Network Access Mode
  • Strategy
  • Projects
  • Environmental Investments Reports
  • Background Data
  • Modernization Fund
  • PNRR - REPOWER EU
  • Programul de Dezvoltare Durabilă 2021-2027
  • Aviz de amplasament
  • Research & Innovation

Asset Publisher

Print SEN Integration of the wind power plants

SEN Integration of the wind power plants

  • Background study

  • Appraisals / Contacts

  • List of inverters that comply with the provisions of ANRE Order 30/17.05.2013 "Technical conditions for connection to electricity networks of public interest for photovoltaic power parks", with later amendments and additions - 25.09.2019

  • Technical date necessary to be transmitted in order to verify the compliance with technical requirements from ANRE Order 208 of 14.12.2018 approving the Technical Norm on the technical connection terms to electricity networks of public interest  for generating modules, power plants consisting of generating modules and power plants of offshore generationg modules. Specifications for inverters mentioned in the provivions of Order 1287 of the Environment Ministry


  • Contact
  • Site Map
  • Links
  • Media
  • Publications
  • FAQ
  • Formular sesizari
  •   Copyright © Transelectrica 2013 - 2025