2. Required Transparency of Network Investments and Planning

Legend:
- CM = Regulation (EC) No 714/2009 of the European Parliament and of the Council of 13 July 2009 on conditions for access to the network for cross-border exchanges in electricity and repealing Regulation (EC) No 1228/2003;
- GGP = Guidelines of Good Practice on Information Management and Transparency in Electricity Markets Ref: E05-EMK-06-10 2 August 2006
- CC =  Electricity Wholesale Market Commercial Code - No. 25/22.10.2004
 
No Information Details File Observations
1 Interconnections where congestions occurred, reasons why the maximum capacity of the interconnections wasn't available to the market participants (if any), explanations of interconnection capacity limitation due to internal congestions (if any), reasons for the occurrence of congestions, methods applied for managing the congestions
CM Annex 5.1
Congestions
RET's Perspective Plan
2 Review of the EHV grid expansion projects (investments) per control area and impact of these projects on the transmission capacities within the control area and at the interconnections
CM Annex 5.5 a)
GGP 2.1
- List of grid expansion projects per control area with the impact of these projects on the transmission capacity Investment Program
- Perspective for the next minimum three years Plan de dezvoltare a RET
3 The operational and planning security standards used by TSO
CM Art.15 alin.2
CM Annex 5.4
- Standard of performance for electricity transmission and system services TSO's Standards
4 Planned outages on interconnections (with the specified dates) and their impact on the capacity of each interconnection
CM Annex 5.1,
GGP 2.2
-Asset concerned, place of asset, start and estimated stop dates of the outage, impact on available transmission capacity, reasons. Annual maintenance plan of the transmission lines and equipments
Monthly maintenance plan of the transmission lines and equipments
Archive-Montly maintenance plan of the transmission lines and equipments
Arhive