Skip to Content

Consumption: 0 MW    Production: 0 MW    Exchange balance: 0 MW

Reasons of Rejection

Navigation

  • About Us
    • History
    • Quality & Environment
    • Profile
    • Supervisory Board
    • Directorate
    • Framework Documents
    • Documents for discussion
    • Licenses and permits
    • Affiliations
    • Corporate Social Responsability
    • Human Resourses
    • GDPR
    • OUG 109/2011 Transparency
  • Investor Relations
    • Bond Issuances
    • Secondary Public Offering
    • Shares
    • Shareholders
    • Shareholders' General Assembly
    • Periodical Reports
    • Current Reports
    • Corporate Governance
    • Rating
    • Services
    • Contact RI
    • General Presentation IR
    • Attendance at Investor and Analyst Conferences
  • ETN Management
    • Background Data
    • Planul de Dezvoltare RET 2024-2033
    • Planul de Dezvoltare RET 2022-2031
    • Planul de Dezvoltare RET 2020-2029
    • SEN Integration of the wind power plants
    • Network Access Mode
    • Strategy
    • Projects
    • Environmental Investments Reports
    • Background Data
    • Modernization Fund
    • PNRR - REPOWER EU
    • Programul de Dezvoltare Durabilă 2021-2027
    • Aviz de amplasament
    • Research & Innovation
  • Transparency
    • Rates
    • Procedures
    • System Load
    • Network Investments and Planning
    • Capacity Calculation
    • Capacity Forecast
    • Capacity Auction and Use Data
    • Network Operation
    • Generation
    • Balancing and Ancillary Services
    • Rapoarte Achizitii
    • Raport anual privind aplicarea Legii nr. 544/2001
    • Newsletter
    • Norme tehnice interne
    • Compensarea dezechilibrelor in cadrul IGCC
  • Electricity Market
    • Balancing market
    • Metering Operator
    • Ancillary services market
    • Green certificates market
    • Capacity Allocation Market
    • Energy transmission service
    • High efficiency cogeneration
    • Debt Reports
    • Contracts for Difference
  • Paneuropean Codes
    • Regulation (EU) 2019/943 on the internal market in electricity
    • COMMISSION REGULATION (EU) 2016/631 of 14 April 2016 establishing a network code on requirements for grid connection of generators
    • COMMISSION REGULATION (EU) establishing a Network Code on Demand Connection
    • COMMISSION REGULATION (EU) establishing a network code on requirements for grid connection of high voltage direct current systems and direct current-connected power park modules
    • COMMISSION REGULATION (EU) establishing a guideline on electricity transmission system operation
    • COMMISSION REGULATION (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management
    • COMMISSION REGULATION (EU) establishing a guideline on forward capacity allocation
    • Commission Regulation establishing a guideline on electricity balancing (EB)
    • Commission Regulation establishing a network code on emergency and restoration (ER)
    • Consultations

Breadcrumbs

  • Transelectrica
  • Transparency
  • Capacity Auction and Use Data
  • Reasons of Rejection

Transparency

  • Rates
    • Regulations
    • Rates archive
  • Procedures
    • Balancing Market
    • Market for allocation of Power System Interconnections
    • Technological System Services Market
    • Operational Management SEN
    • Metodologii ENTSOE aplicate
  • System Load
  • Network Investments and Planning
  • Capacity Calculation
  • Capacity Forecast
  • Capacity Auction and Use Data
  • Network Operation
  • Generation
  • Balancing and Ancillary Services
  • Rapoarte Achizitii
  • Raport anual privind aplicarea Legii nr. 544/2001
  • Newsletter
  • Norme tehnice interne
  • Compensarea dezechilibrelor in cadrul IGCC

Asset Publisher

Print Motive Refuz

title-rejection

Nr.crt Date Observations File

  • Contact
  • Site Map
  • Links
  • Media
  • Publications
  • FAQ
  • Formular sesizari
  •   Copyright © Transelectrica 2013 - 2025