Asset Publisher

6. Required Transparency on Transport Network Operation

Legend:
- CM = Regulation (EC) No 714/2009 of the European Parliament and of the Council of 13 July 2009 on conditions for access to the network for cross-border exchanges in electricity and repealing Regulation (EC) No 1228/2003;;
- GGP = Guidelines of Good Practice on Information Management and Transparency in Electricity Markets Ref: E05-EMK-06-10 2 August 2006
- CC =  Electricity Wholesale Market Commercial Code - No. 25/22.10.2004

 

No Information Details File Observations
1 Details on actual outages (planned and unplanned) of the interconnections, immediately after occurrence
CM Annex 5.1 , GGP 2.8
Asset concerned, place, start and estimated stop date of the outage, reasons, impact on available transmission capacity
Archive of actual outages
2 TAll relevant data related to network access
CM Anexa 5.1
- Requirements for connection to the power transmission grid Electricity Transmission Grid - Technical Code
Technical conditions for the wind power plants connections to the power transmission grid
- Procedures applied by Transelectrica in relationship with users in the process of connection to the power transmission grid Handbook for the users requesting connection of new generation or consumption places to the electricity transmission grid
Anexa 1 - Caracteristici tehnice ale locului de producere
Anexa 2 - Lista documentelor necesare obtinerii ATR
Handbook for the users requesting the sitting permit from CNTEE Transelectrica SA
Applicants' guide for the wind power plants (WPPs) connection to the power transmission grid
3 All relevant data related to network use
CM Annex 5.1
- Monthly physical exchanges and monthly report of net production Monthly report-Net production
Monthly Physical Exchanges
Archive of monthly report-Net production
Archive of monthly physical exchanges
- Relevant data related to consumption , electricity exchanged with other countries , development of electricity market, performance indicators , transmission grid , structure of installed capacity Annual operational report NPS
Technical results of operation NPS
Operational planning studies Operational planning studies
Certificarea conformitatii cu NT30 a CEF
4 The performance indicators for electricity transmission and system services According to the Standard of performance for electricity transmission and system services
Indicators covering:
-Transmission Service / Management and operation of the power transmission grid
- System Services / Coordination of NPS operation
- Continuity of service
- Technical quality of electricity
- Commercial quality of service
- Monitoring the continuity and electricity quality