1 | Details on actual outages (planned and unplanned) of the interconnections, immediately after occurrence CM Annex 5.1 , GGP 2.8 | Asset concerned, place, start and estimated stop date of the outage, reasons, impact on available transmission capacity | | |
| Archive of actual outages |
2 | All relevant data related to network access CM Anexa 5.1 | - Conditions for connection to the power transmission grid | | Electricity Transmission Grid - Technical Code |
| Technical conditions for the wind power plants connections to the power transmission grid |
- Procedures applied by Transelectrica in relationship with users in the process of connection to the power transmission grid | | Handbook for the users requesting connection of new generation or consumption units to the electricity transmission grid |
| Anexa 1 - Caracteristici tehnice ale locului de producere |
| Anexa 2 - Lista documentelor necesare obtinerii ATR |
| Anexa 3 - Cost of studies and tariff of approvals |
| Handbook for the users requesting the sitting permit from CNTEE Transelectrica SA |
- Documents related to the notification and compliance process | | PGMD model for PGMS - power generating module document model for synchronous power generating modules |
| PGMD model for PGM, PPM - power generating module document model for power plant made up of power generating modules |
| ID model for installation document - installation document model for installation document |
| ID (installation document) model for demand units with demand response and connected at a voltage level below 1 000 and DRUD (demand response unit document) model for demand units with demand response and connected at a voltage level above 1 000 V |
| ID (installation document) model for HVDC systems |
| PGMD model for DC-connected power park modules - power generating module document model for direct current- connected power park modules |
| FON (Final Operational Notification) Accept Model |
| EON (Energisation Operational Notification) Accept Model |
| FON (Final Operational Notification) Model |
| LON (Limited Operational Notification) Model |
| EON (Energisation Operational Notification) Model |
| ION (Interim Operational Notification)Model |
- Users' situation regarding the notification and compliance process | | Situation of power generating units |
| Situation of demand units |
| Situation of electricity storage facilities |
| Situation of HVDC systems/ DC-connected power park modules |
3 | All relevant data related to network use CM Annex 5.1 | - Monthly physical exchanges and monthly report of net production | | Monthly report-Net production |
| Monthly Physical Exchanges |
| Archive of monthly report-Net production |
| Archive of monthly physical exchanges |
- Relevant data related to consumption , electricity exchanged with other countries , development of electricity market, performance indicators , transmission grid , structure of installed capacity | | Annual operational report NPS |
| Technical results of operation NPS |
Operational planning studies | | Operational planning studies |
| | Certificarea conformitatii cu NT30 a CEF |
| | |
| | |
4 | The performance indicators for electricity transmission and system services | According to the Standard of performance for electricity transmission and system services Indicators covering: -Transmission Service / Management and operation of the power transmission grid - System Services / Coordination of NPS operation - Continuity of service - Technical quality of electricity - Commercial quality of service - Monitoring the continuity and electricity quality | | |
| |